Transformer Consulting Services

 
Scroll

Transformer Consulting Services

 
Scroll

Transformer Consulting Services

 
Scroll
We work
around the world
We guarantee
accuracy of our calculations
We develop
detail 3D model of transformer
We design transformers
and shunt reactors up to 800 KV

Transformer Solutions

4 Real Benefits
of Transformer Consulting Services

01
Reduction of risks
Detailed analysis of the transformer project performed by our company
allows you to find and remove problems that may arise with the transformer.
03
Time savings
Cooperation with our company will reduce the time spent on the development and production of the transformer.
02
Cost Optimization
We know how to reduce the cost of the transformer with the same level of guaranteed parameters.

04
Up-to-date Knowledge
and Technology
Our company uses up-to-date developments and technologies in
the field of the transformer design and manufacturing.
2010
Since
We design transformers
and shunt reactors.
11
countries
Our customers are from many countries of the world.
500
more than
We develop detailed manufacturing drawings of a power transformer.
1000 MVA
up to
We design transformers of high capacity.
Сompleted projects
01\03
3 phase Power AutoTransformer
3 phase Converter Transformer
3 phase Power Transformer
3 phase Power Transformer
90 days
90 days
90 days
90 days
Project timeline
40 more than
4 more than
30 more than
30 more than
Volume of calculations
10 persons
10 persons
10 persons
10 persons
Number of specialists in the team
500 more than
-
30 more than
30 more than
Total number of manufacturing drawings issued by the team
Transformator
Scope of work
List of drawings
List of calculations
Information about transformer designed by our company:
3 phase Power AutoTransformer 250000kVA – 400kV/164kV, ONAN/ONAF/OFAF

Designed for: ELTAS TRANSFORMER, TURKEY.
Information about transformer designed by our company:
3 phase Converter Transformer 50MVA – 33kV/2.65kV

Designed for: ELSEWEDY TRANSFORMERS, EGYPT
Information about transformer designed by our company:
3 phase Power Transformer 175000kVA – 220kV/24kV/24kV

Designed for: ELSEWEDY TRANSFORMERS, EGYPT
Information about transformer designed by our company:
3 phase Power Transformer 250000kVA – 220kV/34kV/34kV

Designed for: ELSEWEDY TRANSFORMERS, EGYPT

Scope of work executed by our company:

  1. Seeking of an original model of transformer which will satisfy to requirements indicating in the specification;
  2. Carrying out of calculations of the model;
  3. Developments of drawings of basic parts of transformer;
  4. Design review of the project by videoconferencing;
  5. Development of detail manufacturing drawings of transformer;
  6. Support during transformer manufacturing.

Scope of work executed by our company:

  1. Design Review

Scope of work executed by our company:

  1. Seeking of an original model of transformer which will satisfy to requirements indicating in the specification;
  2. Carrying out of calculations of the model;
  3. Developments of drawings of basic parts of transformer;
  4. Design review of the project by videoconferencing;
  5. Development of detail manufacturing drawings of transformer;
  6. Support during transformer manufacturing (20 man days).
  1. Seeking of an original model of transformer which will satisfy to requirements indicating in the specification;
  2. Carrying out of calculations of the model;
  3. Developments of drawings of basic parts of transformer;
  4. Design review of the project by videoconferencing
  5. Development of detail manufacturing drawings of transformer;
  6. Support during transformer manufacturing (20 man days).

List of manufacturing drawings:

  1. Core
  2. Insulation
  3. Windings
  4. Active part
  5. Leads
  6. Common view
  7. Tank
  8. Cooling system.

List of manufacturing drawings, that were reviewed:

  1. Core
  2. Insulation
  3. Windings
  4. Active part
  5. Leads
  6. Common view
  7. Tank
  8. Cooling system.

List of manufacturing drawings, that were reviewed:

  1. Core
  2. Insulation
  3. Windings
  4. Active part
  5. Leads
  6. Common view
  7. Tank
  8. Cooling system.

List of manufacturing drawings, that were reviewed:

  1. Core
  2. Insulation
  3. Windings
  4. Active part
  5. Leads
  6. Common view
  7. Tank
  8. Cooling system.

List of calculations:

  1. Calculation of I2R, circulating and eddy losses in winding;
  2. Calculation of impulse stresses and safety margins between all disks of all windings;
  3. Turn insulation calculation;
  4. Major insulation calculation.

You can see full list of calculations on the project page, link below

List of calculations:

  1. Dynamic stability of short circuit for active part (Windings, Clamps and pressing rings);
  2. Calculation of stray losses in structural parts of a transformer as frames, flitch palates, last packets of core, magnetic shunts and in a tank;
  3. Thermal calculation of structural parts of a transformer as frames, flitch palates, last packets of core, magnetic shunts and in a tank due to stray;
  4. Recommendations regarding improving of current transformer design.

List of calculations:

  1. Calculation of I2R, circulating and eddy losses in winding;
  2. Calculation of impulse stresses and safety margins between all disks of all windings;
  3. Turn insulation calculation;
  4. Major insulation calculation: calculation of safety margins between winding and grounding parts of a transformer, between leads and grounding parts of a transformer or, between bushing and grounding parts of a transformer.

You can see full list of calculations on the project page, link below

List of calculations:

  1. Calculation of I2R, circulating and eddy losses in winding;
  2. Calculation of impulse stresses and safety margins between all disks of all windings;
  3. Turn insulation calculation;
  4. Major insulation calculation: calculation of safety margins between winding and grounding parts of a transformer, between leads and grounding parts of a transformer or, between bushing and grounding parts of a transformer.

You can see full list of calculations on the project page, link below

Learn More
Our partners
This website requires cookies to provide all of its features. By using our website, you agree to our use of cookies. We do not collect any of your personal data.Hide this message